Finished grey stucco house with a white front door, a stepping-stone path over white gravel and a green lawn

Backyard ADUconstruction

Accessory dwelling units, designed, permitted and built from groundwork to keys.

Dark-clad building wall with a white front door and a window, concrete steps and wooden boards on the ground

ADU construction

A second homeon your lot

We design and build accessory dwelling units: the plans, the city submittal and approval, and the construction through the last finishing detail.

The owner stays involved from the first meeting to the walk-through, and the price we quote is the price of the whole job as scoped with you.

  • Interior design package
  • Plans and permits
  • One all-inclusive price

In depth

Adding an ADU to aLos Angeles County lot

The kinds of unit you can add, how permits work in the City of LA and in unincorporated LA County, and what changes on lots that burned in 2025.

Four ways to add a unit

State law allows an ADU inside existing space, attached to the house or detached from it, plus a junior ADU inside the home, and a single-family lot can combine them. Our guide to California ADU rules covers each rule with its source.

  • A converted ADU sits inside the house or an existing accessory structure such as a garage, and may grow by up to 150 square feet for an entrance. No setback is required for existing space, and the city cannot require a new utility connection or connection fee unless the unit is built with a new house.
  • An attached ADU can be up to half the size of the existing house, and up to 25 feet tall or the house's height limit, whichever is lower.
  • A detached ADU can be up to 1,200 square feet. A city must approve at least one of up to 800 square feet with four-foot side and rear setbacks, and from January 1, 2027 that rises to two.
  • A junior ADU of up to 500 square feet sits entirely inside the house. Since 2026 the owner has to live on the property only if the junior unit shares a bathroom with the house.

Permits in the City and the County

An ADU goes through the same building department as a house: LADBS in the City of Los Angeles, and LA County Public Works in unincorporated areas such as Altadena. The County notes that the state fire code requires automatic sprinklers in all new single-family homes, ADUs and duplexes. In the City, a detached ADU in a Very High Fire Hazard Severity Zone, or any ADU more than 150 feet from the edge of the roadway, needs a Fire Department clearance for hydrants and access.

LA County offers three free pre-approved ADU plans, prepared with Regional Planning and Public Works: two of 1,200 square feet with three and two bedrooms, and one of 800 square feet with one bedroom. They are permitted exactly as designed, though they can be mirrored and turned to suit the lot. The County was drafting changes to its ADU ordinance in 2026; it says the draft does not carry the force of law, and the current County and State rules govern ADU projects.

Fees

No impact fees can be charged on an ADU of 750 square feet or less, or a junior ADU of 500 square feet or less. A larger ADU pays impact fees in proportion to the size of the main house, and from January 1, 2027 those fees, for up to two ADUs on a lot, are charged only on the area above 750 square feet. For school fees, a unit under 500 square feet counts as adding less than the 500 square feet at which those fees begin. An ADU that is not converted from existing space can be charged a utility connection fee in proportion to its load on the water or sewer system.

On septic lots in Altadena, the County's rebuild guidance says that adding bedrooms needs a Public Health permit for a septic system sized to match, or a connection to the sewer when the lot is within 200 feet of a public sewer line.

ADUs on fire-damaged lots

  • Altadena. Under the County's Eaton fire interim ordinance, a household can live in a new standalone ADU until January 7, 2030, while the main house is rebuilt, and the ADU stays as a permanent unit. When a new ADU covers the footprint of a burned garage, replacement parking is not required, though it may still be in Very High Fire Hazard Severity Zones. The County's fee deferral for owner-occupants covers an ADU built as part of the rebuild.
  • Pacific Palisades. Under the Mayor's Executive Orders 1 and 8, a new or rebuilt detached ADU on an eligible lot is not held to the 110% footprint and height limit. In the Coastal Zone it must sit at least 10 feet from a canyon bluff and 25 feet from a coastal bluff, and AB 462 requires a decision on its coastal development permit within 60 days.
  • Moving in first. AB 462 also requires a city to issue a certificate of occupancy for a detached ADU before the main house when the main house was substantially damaged or destroyed, in counties under a state of emergency proclaimed on or after February 1, 2025.

More detail on each program is in our guides to rebuilding in Altadena and rebuilding in Pacific Palisades.

What to check about your lot

  • Distance to transit. Within a half-mile walk of public transit, a city cannot require parking for the ADU. Within a half-mile walk of a major transit stop, a detached ADU can be 18 feet tall instead of 16, plus 2 feet for a roof pitch that matches the house.
  • Fire hazard zone. It decides the wildfire construction rules and, in the City, the Fire Department clearance for a detached ADU.
  • Coastal Zone. In the City, ZIMAS shows whether a parcel is in the Coastal Zone under its "Additional" tab.

CRG Construction designs and builds ADUs, prepares the plans and handles the city submittal and permit process for each unit.

Sources

What’s included

Included inevery project

From the first drawing to the final detail, so you are never coordinating separate trades.

  • Interior design package

    Finishes and fixtures planned for a small footprint that lives large.

  • Plans for city approval

    Architectural and structural plans as required, submitted and followed through approval.

  • Pre-approved plans

    Working from plans the city has already approved? We build them as drawn.

  • Groundwork to finish

    Foundation, utilities, framing, finishes and final details.

How it runs

Four stages,one team

Design package, plans and permits, demolition and build, finishing and cleaning, managed by the owner.

  1. 01

    Design package

    We plan layouts, finishes and fixtures with you before anything is ordered.

  2. 02

    Plans and permits

    Architectural and structural plans, submitted to the city and followed through approval.

  3. 03

    Demolition and build

    Demolition where needed, then construction from groundwork up, managed by the owner.

  4. 04

    Finishing and cleaning

    Finishes, final details and a full clean before you move in.

The details

Small footprint,full-size home

Open living room with wood-look vinyl floors, a ceiling fan and a sliding glass door with dark curtains, the kitchen beyond
01Living room
Open kitchen with white shaker cabinets, stainless appliances, a white island with pendant lights and a grey tile backsplash
02Kitchen
Dark-clad single-storey building with white windows, the wall covering still going on and dirt piled in front
03The unit

Photos are for illustration.

California ADU law

State ADU rulesin plain words

California’s ADU law (Government Code §66314 and the sections after it) limits how cities can slow or block an ADU. These are the points homeowners ask about most.

  • Ministerial approval

    An ADU permit is approved by staff against set standards, with no discretionary review or hearing (§66317(a)(1)).

  • 15 business days

    The permitting agency must say whether an application is complete within 15 business days of receiving it (§66317(a)(2)).

  • 60 days to decide

    Once the application is complete, the city must approve or deny it within 60 days when a home already stands on the lot (§66317(a)(3)).

  • 800 sq ft, 16 ft

    Local rules must still allow an ADU of at least 800 sq ft with four-foot side and rear setbacks, and a detached ADU at least 16 ft tall (§66321).

Questions

Commonquestions

Still wondering about something? Call (323) 714-5383

Who handles the city approval?

We do. We prepare the architectural and structural plans as required, submit them to the city and follow them through approval.

Can you use pre-approved ADU plans?

Yes. If you are working from plans the city has already approved, including a city’s pre-approved standard plans, we build them as drawn.

How long does the city have to review an ADU?

Under California law, once a permit application for an ADU is complete, the city has 60 days to approve or deny it when there is already a home on the lot (Gov. Code §66317).

Sources

Rules and programmes change. We confirm the current requirements with the permitting office for every property; nothing here is legal advice.

  1. California Government Code §66317 (ADU permit timelines) as amended by SB 543, effective January 1, 2026
  2. California Government Code §66321 (ADU size and height) as amended by SB 543, effective January 1, 2026
  3. California Government Code §66314 (ADU approvals)

Free estimate

Tell us whatyou are planning

We call you back to talk it through, then give you one all-inclusive estimate for the whole job. No low numbers that grow later.

CSLB B #1159954