Finished grey stucco house with a white front door, a stepping-stone path over white gravel and a green lawn

New homeconstruction

A complete home, from groundwork to the last cabinet pull, built by one team.

Steel reinforcing bar laid over yellow insulation in a concrete foundation, with the framing of the house and trees behind

New construction

A whole home,one team

We build complete homes from the ground up: plans, permits, structure, finishes and the final clean, under one all-inclusive price.

The owner stays involved from the first meeting to the walk-through, and the price we quote is the price of the whole job as scoped with you.

  • Interior design package
  • Plans and permits
  • One all-inclusive price

In depth

Building a new homein Los Angeles County

What a new house goes through in the City of Los Angeles and in unincorporated LA County, from the first clearances to the codes it is built to.

Who reviews a new house

Where the lot sits decides who issues the permit. In the City of Los Angeles, including Pacific Palisades, it is the Department of Building and Safety (LADBS). In unincorporated areas such as Altadena, it is LA County Public Works, Building and Safety. Other cities in the county run their own building departments.

In the City, every required clearance from another department has to be approved before LADBS issues the building permit. Zoning plan check is now done by City Planning's Zoning Review Division, and LADBS routes projects there automatically through ePlanLA. Other clearances a new house often meets are the Fire Department's review of hydrants and access, which applies to all new buildings in a Very High Fire Hazard Severity Zone, and the Bureau of Engineering's sewer availability clearance. LADBS's submittal list for a new single-family home includes soils and geology reports, and grading plans when grading is proposed.

In the County, plan check issues an agency referral, and the applicant is responsible for getting every agency's approval before the permit is issued. A private septic system needs Health Department approval. Regional Planning has to approve some projects, such as a home on a lot under 5,000 square feet, and where grading is involved, rough grading approval comes before the building permit.

The energy code for new homes

The 2025 California Energy Code applies to permit applications filed on or after January 1, 2026. New single-family homes must have solar panels, with five exceptions. The prescriptive baseline for space heating is a heat pump; gas heating remains possible through the performance path, and a home with gas or propane appliances must also be wired electric-ready for them. A new home with electrical service over 125 amps must be ready for a battery, unless a battery is installed. Under the state's green building code, a new home with an attached garage needs a raceway and a 40-amp circuit marked "EV CAPABLE" for a future charger.

The City of Los Angeles adopted an all-electric requirement for new buildings in 2023 and repealed it with Ordinance 188716, effective October 13, 2025.

Building in a fire hazard zone

With the 2025 code, California moved its wildfire construction rules into a new Wildland-Urban Interface Code. They apply to new buildings in the state's fire hazard severity zones and in High and Very High zones that cities and counties designate, and the property has to meet the vegetation management requirements before the permit is finaled. LA County adopted updated hazard maps for its areas on July 22, 2025, and state law requires the City of Los Angeles to adopt CAL FIRE's recommended maps by ordinance.

Automatic fire sprinklers are required in every new single-family home, ADU and duplex. The County's referral sheet for Eaton fire rebuilds says the state fire code requires them, and the City's 2025 building code ordinance requires a residential sprinkler system in every new one- or two-family dwelling. The City notes that Pacific Palisades has been a Very High Fire Hazard Severity Zone since 1999.

Plan check, fees and time

LADBS returns regular plan check comments within weeks, depending on workload, and expedites the review if the owner pays 50% more of the plan check fee. LA County may charge more for plan checks needed after the second one.

School district fees apply to new homes, and no building permit is issued without the school district's certification. In the City, a permit is valid for two years but expires after 12 months if work has not started. In the County, a permit expires if work has not started within 12 months or stops for more than 180 days.

Rebuilding after the Eaton and Palisades fires

A fire rebuild follows its own rules. In Altadena, a like-for-like home can grow by up to 10% or 200 square feet, whichever is greater, and skips current zoning; in Pacific Palisades, the Mayor's orders allow up to 110% of the old footprint and height without discretionary review. The Governor's Executive Order N-37-25 lets these rebuilds use the 2022 building code instead of the 2025 code, except for the State Fire Marshal's fire and public safety rules, and suspends the solar panel and battery requirements while keeping the Solar Ready rules. Our guides cover each step: rebuilding in Altadena and rebuilding in Pacific Palisades.

For a new home, CRG Construction prepares the architectural plans, and structural plans where the design needs them, and handles the city submittal and permit process.

Sources

What’s included

Included inevery project

From the first drawing to the final detail, so you are never coordinating separate trades.

  • Interior design package

    Layouts, finishes and fixtures chosen with you before anything is ordered.

  • Architectural and structural plans

    Drawn for your lot and prepared for city submittal; structural plans where the design needs them.

  • Your approved plans welcome

    Already have plans approved by the city? We build from them.

  • Groundwork to hardware

    Foundation, framing, systems, finishes and the final cabinet hardware.

How it runs

Four stages,one team

Design package, plans and permits, demolition and build, finishing and cleaning, managed by the owner.

  1. 01

    Design package

    We plan layouts, finishes and fixtures with you before anything is ordered.

  2. 02

    Plans and permits

    Architectural and structural plans, submitted to the city and followed through approval.

  3. 03

    Demolition and build

    Demolition where needed, then construction from groundwork up, managed by the owner.

  4. 04

    Finishing and cleaning

    Finishes, final details and a full clean before you move in.

The details

From drawingsto the last detail

Pencil and scale ruler resting on a dimensioned construction drawing
01Plans and permits
Roof trusses and wall framing of a new house against a clear blue sky, with a CRG Construction sign at the edge
02Framing
Grey stucco house with a white front door and a lawn, seen from the drive at dusk with a white SUV parked beside it
03The finished home

Photos are for illustration.

Questions

Commonquestions

Still wondering about something? Call (323) 714-5383

Do you design the house too?

Every new home comes with an interior design package, and we prepare the architectural plans, plus structural plans when the design needs them, ready for city submittal.

I already have approved plans. Can you build them?

Yes. If the city has already approved your plans, we can build from them as drawn.

What does the estimate include?

The whole job as we scope it with you: design package, plans, permits, construction, finishing and the final clean, in one all-inclusive price.

Free estimate

Tell us whatyou are planning

We call you back to talk it through, then give you one all-inclusive estimate for the whole job. No low numbers that grow later.

CSLB B #1159954