Remodeled kitchen with navy base cabinets, a tall navy pantry, stainless appliances and grey wood-look floors

Full homerenovation

A whole-home renovation, turnkey: design, permits, demolition, build, finishing and a final clean.

Remodeled tub and shower with grey marble-look tile, a blue patterned shower curtain and a white toilet

Full home renovation

Every room,one plan

We renovate whole homes turnkey: the design package, plans and permits, demolition, construction, finishing and a final clean before you move back in.

The owner stays involved from the first meeting to the walk-through, and the price we quote is the price of the whole job as scoped with you.

  • Interior design package
  • Plans and permits
  • One all-inclusive price

In depth

Renovating a wholehome in Los Angeles

What a whole-house renovation involves on paper in the City of LA and in unincorporated LA County: permits, inspections, energy rules and the hazards of older homes.

The permits a full renovation usually needs

A renovation that moves walls, rewires and replumbs a house needs more than one permit. In the City of Los Angeles, the Department of Building and Safety (LADBS) has to approve plans before it issues a permit for interior changes that alter the floor plan, and electrical, plumbing and heating or cooling work each take their own permit when they are not part of the building permit. In unincorporated areas such as Altadena, LA County Public Works lists kitchen remodels, stucco, window and door changeouts and garage conversions among the work that needs a permit.

Finish work is lighter. The County exempts painting, papering, tiling, carpeting, cabinets and countertops where disabled access rules do not apply, and the City exempts painting and papering and, since December 31, 2025, work valued at $2,500 or less that does not affect structure, safety or use. Our guide to renovation permits in Los Angeles goes through each step with its sources.

Plan check and other approvals

LADBS reviews alterations to a house or duplex at the counter, on the day the plans are submitted, and sends larger projects to regular plan check, which can be expedited for 50% more of the plan check fee. In a Historic Preservation Overlay Zone, most exterior changes also need written approval from City Planning. In the County, plans that can be checked in 15 minutes or less may be reviewed over the counter, and structural elements must be stamped by a licensed engineer.

Inspections follow the work: in the City, foundations, then framing with the pipes, vents and ducts in place, then the wall covering, then a final, and nothing may be covered before it is approved. A City permit expires after 12 months if work has not started; a County permit expires if work has not started within 12 months or stops for more than 180 days.

Older homes: lead and asbestos

For homes built before 1978, the EPA's lead paint rule requires that anyone paid to disturb painted surfaces be certified and use lead-safe work practices; window replacement and demolition of painted surfaces are always covered. For asbestos, the South Coast AQMD's Rule 1403 requires a survey by a Cal/OSHA-certified person before renovation or demolition, and notice to the district at least 10 working days before work begins; for a single-family home the survey rule does not apply when less than 100 square feet of asbestos-containing material is removed.

Energy rules when systems change

Permit applications filed since January 1, 2026 follow the 2025 California Energy Code. A remodel that changes the building envelope, the heating and cooling, or the water heating needs a compliance form with the permit application, and changes to heating and cooling will likely need third-party field verification and testing. Only the lighting that is altered has to meet the code, and the solar panel requirement for new homes does not apply to alterations. When windows are replaced under an LADBS express permit, they must be dual-glazed and NFRC-labeled.

Homes in fire zones and fire-damaged homes

In a Very High Fire Hazard Severity Zone, LADBS requires a Class A roof covering when a roof is replaced under an express permit. For homes in Pacific Palisades damaged in the January 2025 fire, the City's Ordinance 188985 waives permit fees for repairing or rebuilding a damaged structure, up to 110% of its area, for the owner of record on January 7, 2025. In Altadena, the County's fee deferral is for rebuilt homes; its list of fees that are not deferred includes repairs.

Contracts and the paperwork after

A renovation is a home improvement contract under California law. The down payment can be no more than $1,000 or 10% of the price, whichever is less, progress payments cannot run ahead of the work, and in most cases the owner can cancel within three business days of receiving the signed contract, or five if 65 or older. Our guide to hiring a contractor in California covers the license check, the contract and lien releases.

Permits also matter when the house is sold. LA County warns that unpermitted work can lower resale value, add the cost of permitting or tearing it out, and lead to denied insurance claims, and in the City a seller must give the buyer a Residential Property Report before the sale.

CRG Construction handles the plans and permits for the renovations it builds, from the design package to the final clean.

Sources

What’s included

Included inevery project

Turnkey from the first drawing to the final clean, so you are never coordinating separate trades.

  • Interior design package

    Every room planned together, so the house reads as one.

  • Plans, permits and code

    A set of construction plans and the permits, built to city and building code.

  • Demolition to finishing

    Demolition, full construction and the finishing work, by one team.

  • Final cleaning

    We clean the house top to bottom before we hand you the keys.

How it runs

Four stages,one team

Design package, plans and permits, demolition and build, finishing and cleaning, managed by the owner.

  1. 01

    Design package

    We plan layouts, finishes and fixtures with you before anything is ordered.

  2. 02

    Plans and permits

    Architectural and structural plans, submitted to the city and followed through approval.

  3. 03

    Demolition and build

    Demolition where needed, then construction from groundwork up, managed by the owner.

  4. 04

    Finishing and cleaning

    Finishes, final details and a full clean before you move in.

The details

Demolitionto final clean

The original kitchen before the remodel: oak cabinets, tiled counters, black appliances and a beige tile floor
01Before the remodel
Remodeled bathroom with a walk-in glass shower, grey marble-look tile, a pebble shower floor and a vanity with a round mirror
02New bathroom
Remodeled living room with white walls, grey wood-look floors and a white fireplace with a marble surround and an electric insert
03Finished room

Photos are for illustration.

Questions

Commonquestions

Still wondering about something? Call (323) 714-5383

Is it really turnkey?

Yes. Design package, construction plans and permits, demolition, construction, finishing and a final clean, all by one team.

Will the work meet code?

We plan and build to city and building code, with the permits the work requires.

Do you clean up at the end?

A full final clean is part of every renovation, before you move back in.

Free estimate

Tell us whatyou are planning

We call you back to talk it through, then give you one all-inclusive estimate for the whole job. No low numbers that grow later.

CSLB B #1159954